Rail(Beijing)

轨道交通(北京)

Beijing Metro Line 9

  • Author: Administrator
  • Date: 2016-12-30 09:45:25
  • CTR: 1735

Beijing Metro Line 9 - Third Party Monitoring, Geotechnical Investigation, Safety Risk Assessment

A total length of about 16.5km, is the first in Beijing to carry out third-party monitoring of the subway line.