CHN
EMAIL
LOGIN
投资者
投资者2
投资者1
HOME
About Us
Services
Achievements
Innovation
Credit Honor
Culture
Achievements
Achievements
Rail(Beijing)
Rail(Outside of Beijing)
Civil Construction
Municipal Engineering
International Engineering
Others
Home
Achievements
Rail(Beijing)
BACK
Rail(Beijing)
轨道交通(北京)
Beijing Metro Line 8
2016-12-30
Beijing Metro Line 8 - Geotechnical Engineering Survey, Engineering SurveyThe length of 45.7km, is China's only Olympic theme subway line.
更多详细
Capital Airport Line
2016-12-30
Capital Airport Line - Third Party Monitoring, Geotechnical Investigation, Engineering Survey, Safety Risk AssessmentLength of 27.3km, as a major risk project, in the next through the airport highway
更多详细
Beijing Metro Line 10
2016-12-30
Beijing Metro Line 10 - Geotechnical engineering survey, engineering survey, third-party monitoring, empty census, security risk assessment, engineering rescueA total length of 57km, all for the under
更多详细
Beijing Metro Line 9
2016-12-30
Beijing Metro Line 9 - Third Party Monitoring, Geotechnical Investigation, Safety Risk AssessmentA total length of about 16.5km, is the first in Beijing to carry out third-party monitoring of the subw
更多详细
Beijing Metro Line 4
2016-12-30
Beijing Metro Line 4 - Geotechnical Engineering Survey, Engineering SurveyLine 4 is the 60th anniversary of the National Day gift works, full-length 27.3km.
更多详细
Beijing Metro Line 6
2016-12-30
Beijing Metro Line 6 - Geotechnical Engineering Survey, Engineering SurveyFull-length 52km, through the center city of East-West all-underground rail transit backbone.
更多详细
1
2
3
4
Skip to:
GO